In November 2025, Quebec is celebrating a major milestone: more than 200,000 electric vehicles will be on its roads, compared to 160,000 in 2023, with an ambitious projection of 1.5 million by 2030 according to the Plan for a Green Economy. This wave of adoption, boosted by public incentives, hides an often overlooked opportunity: 72% of EV owners are still unaware of the subsidies available, according to a CAA-Quebec 2025 survey. Result? Thousands of dollars lost with each installation.
At Bornes Électron, our mission is clear: to make charging accessible and cost-effective. This exhaustive guide of more than 2,500 words deciphers all the 2025 aid with surgical precision: updated amounts, strict conditions, simplified procedures, and quantified depreciation. Whether you are an individual, a condominium association, or a company, you will know exactly how much to recover and how. Ready to turn an expense into a lightning-fast investment? Launch your project with a free request for a quote – grant file included.
Complete Overview of 2025 Grants: 5 Sources, Cumulative, Up to $7,100 per Charging Station
Quebec offers the most generous program in North America. Here is the exhaustive table of aid, with eligibility, amounts, deadlines, and cumulation:
Source of Help
Type of Beneficiary
Maximum amount
Key Conditions
Payment Deadline
Cumulative?
Simplified process
Drive Green (Provincial)
Résidentiel
$600 / charging station
Level 2 terminal, CMEQ install, invoice 2025
6-8 weeks
Oui
RQ-VE form + photos
Joint ownership
$600 / charging station + 50% infrastructure (max $5,000)
Mutualized, vote AGM, >20 units
8 weeks
Oui
Copro portal + union quote
Enterprise
$600 / station + $1,000 fleet bonus (10+ stations)
Fleet or public parking
6 weeks
Oui
Company file
Hydro-Québec – Option d.
All
$0.06/kWh (11pm-7am)
Dedicated meter
Immediate
Oui
Online Activation
Federal – iZEV Infrastructure
Copro / Company
50% of costs (max $5,000/station)
Shared infrastructure
12 months (taxes)
Oui
T2/T2125 return
Municipalities
Residential / Copro
$400 to $600 / terminal
Location, install 2025
4-6 weeks
Oui
Local form
Business Tax Credit (Federal)
Enterprise
30% (max $20,000/site)
Fleets, shops
Annual
Oui
Taxes 2025
Maximum total per charging station (shared copro): $7,100 ($600 Ride + $5,000 infrastructure + $600 municipal + $1,500 federal). Consult our dedicated page: Subsidies and financial aid.
Assistance #1: Drive Green – The Queen’s Grant, up to $5,000 in co-ownership
For Individuals (Residential)
Amount: $600 per level 2 charging station. Detailed conditions:
Purchase/installation after January 1, 2025.
Energy Star certified charging station (all our Electron models).
CMEQ electrician mandatory (we are).
Proof: invoice, before/after photos, certificate of conformity.
Amortization: 10 months with >$1,000/year savings (10,000 km).
For Condominiums (Mutualized)
Amount: $600 per station + 50% of the infrastructure fee (max $5,000) + powersharing bonus $2,000 (new 2025). Conditions: Vote at the General Assembly, install CMEQ, collective file.