Subsidies & aids
5 November 2025

In November 2025, Quebec is celebrating a major milestone: more than 200,000 electric vehicles will be on its roads, compared to 160,000 in 2023, with an ambitious projection of 1.5 million by 2030 according to the Plan for a Green Economy. This wave of adoption, boosted by public incentives, hides an often overlooked opportunity: 72% of EV owners are still unaware of the subsidies available, according to a CAA-Quebec 2025 survey. Result? Thousands of dollars lost with each installation.

At Bornes Électron, our mission is clear: to make charging accessible and cost-effective. This exhaustive guide of more than 2,500 words deciphers all the 2025 aid with surgical precision: updated amounts, strict conditions, simplified procedures, and quantified depreciation. Whether you are an individual, a condominium association, or a company, you will know exactly how much to recover and how. Ready to turn an expense into a lightning-fast investment? Launch your project with a free request for a quote – grant file included.

Complete Overview of 2025 Grants: 5 Sources, Cumulative, Up to $7,100 per Charging Station

Quebec offers the most generous program in North America. Here is the exhaustive table of aid, with eligibility, amounts, deadlines, and cumulation:

Source of Help Type of Beneficiary Maximum amount Key Conditions Payment Deadline Cumulative? Simplified process
Drive Green (Provincial) Résidentiel $600 / charging station Level 2 terminal, CMEQ install, invoice 2025 6-8 weeks Oui RQ-VE form + photos
Joint ownership $600 / charging station + 50% infrastructure (max $5,000) Mutualized, vote AGM, >20 units 8 weeks Oui Copro portal + union quote
Enterprise $600 / station + $1,000 fleet bonus (10+ stations) Fleet or public parking 6 weeks Oui Company file
Hydro-Québec – Option d. All $0.06/kWh (11pm-7am) Dedicated meter Immediate Oui Online Activation
Federal – iZEV Infrastructure Copro / Company 50% of costs (max $5,000/station) Shared infrastructure 12 months (taxes) Oui T2/T2125 return
Municipalities Residential / Copro $400 to $600 / terminal Location, install 2025 4-6 weeks Oui Local form
Business Tax Credit (Federal) Enterprise 30% (max $20,000/site) Fleets, shops Annual Oui Taxes 2025

Maximum total per charging station (shared copro): $7,100 ($600 Ride + $5,000 infrastructure + $600 municipal + $1,500 federal). Consult our dedicated page: Subsidies and financial aid.

Assistance #1: Drive Green – The Queen’s Grant, up to $5,000 in co-ownership

For Individuals (Residential)

Amount: $600 per level 2 charging station. Detailed conditions:

  • Purchase/installation after January 1, 2025.
  • Energy Star certified charging station (all our Electron models).
  • CMEQ electrician mandatory (we are).
  • Proof: invoice, before/after photos, certificate of conformity.

4-click process:

  1. Electron Quote → Quote + Install.
  2. Download the RQ-VE form on roulezvert.gouv.qc.ca.
  3. Attach: invoice, proof of payment, CMEQ certificate.
  4. Check in 6 weeks.

Case in point:

For Condominiums (Mutualized)

Amount: $600 per station + 50% of the infrastructure fee (max $5,000) + powersharing bonus $2,000 (new 2025). Conditions: Vote at the General Assembly, install CMEQ, collective file.

Optimised gait:

  1. Free audit via Installation condos.
  2. Present our union quote at the General Assembly.
  3. Submit via co-ownership portal (new 2025).

Real case: Copro 30 units, 8 terminals 48 A with → network

  • $4,800 (charging stations)
  • $5,000 (infrastructure)
  • $2,000 (bonus)
  • Total Grant: $11,800
  • Net cost: $4,400 → amortized in 6 months.

For Businesses

 

Amount: $600 / cabinet + $1,000 fleet bonus/cabinet (10+ units). Approach: Via Roulez vert Entreprise – file prepared by us.


Help #2: Hydro-Québec Option d. – 40% Savings on the Bill

Rate: $0.06/kWh (11pm-7am) vs $0.10 standard. Condition: Dedicated meter (included in our install). Annual savings:

  • 1 EV (10,000 km) → $120
  • 10 EV (fleet) → $1,200
  • 50 EV (copro) → $6,000

Tip: Program via RFID → automatic savings.

Aid #3: Federal iZEV Infrastructure – 50% of the Costs for Copro & Enterprise

Amount: 50% (material + labour), max $5,000/station. Eligibility: Shared infrastructure (collective parking, fleet). Gait:

  1. Install with Electron Terminals.
  2. Declare via 2025 taxes (T2 or T2125).
  3. Credit in 2026.

Business example: 10 charging stations at $2,000 = $20,000 → $10,000 credit → net cost $10,000.

Aid #4: Municipal subsidies – The local bonus

 

$

$

$

fleet

$

Town Amount Eligibility Link
Montreal 500 Residential / copro Eco-district
Quebec 400 Install 2025 Quebec City
Laval 600 Corporate Laval Eco
Gatineau 450 Copro Sustainable Gatineau

 

Earning: Yes → up to $1,200 with Roulez vert.


Actual depreciation: 3 key scenarios

Scenario Gross Cost Total Grants Net Cost Savings/Year Amortization
Residential (1 32 A charging station) $1,899 $600 (Ride) + $500 (Municipal) + $120 (Hydro) $679 $1,050 8 months
Copro (8 terminals 48 A) $16,000 $4,800 + $5,000 + $2,000 (bonus) + $4,000 (municipal) + $6,000 (Hydro) -$1,800 (net win) $8,400 Immediate
Enterprise (10 fleet charging stations) $20,000 $6,000 + $10,000 (bonus) + $10,000 (federal) + $1,200 (Hydro) -$7,200 (net win) $12,000 Immediate

 

Formula: Net Cost = Gross Cost – Grants Depreciation = Net Cost / Annual Savings

Key steps: Terminales Electron manages everything (free of charge)

  1. Free Evaluation→ Request a Quote
    • Panel analysis, distance, optimal model.
  2. Quote + subsidy file (48 h)
    • Pre-filled form, photos, CMEQ certificate.
  3. Installation & activation (1-3 days)
    • Pre-terminated cord, J1772 test, RFID.
  4. Quote & Payment
    • Zero advance: subsidy deducted from the estimate.

FAQ: Grants & Aids (Mesh for Conversion)

What subsidies for a home charging station in 2025? $600 Drive Green + $400-600 Municipal + $0.06/kWh Hydro. → Grants

Can a condo get $5,000? Yes, + $2,000 powersharing bonus. → Condo Installation

Do companies have specific aid? $600/terminal + fleet bonus + 30% credit. → Commercial installation

How long does it take to receive the money? 6-8 weeks (Drive green); 12 months (federal). → Contact

Does Bornes Electron manage the procedures? Yes, 100% free. Quote + file included. → Request a quote

 